Newlandsfield Summer Regeneration Programme
Are you able to help the club complete any of these tasks? If so, Newlandsfield will be open every Saturday morning and afternoon during the close season (and probably some Sundays too!)
All equipment will be provided, and there’s a very high chance you’ll get a refreshment and bite to eat too!
Your support is vital to the football club, and even helping complete one task makes a huge difference to the club.
If you want to offer your services, drop an email to stadium@pollokfc.com to let the ground team know.
Scored out tasks have now been completed.
Outdoor Tasks
Paint Main Gate |
Gardens tended, Heather Planted |
Flagpole rope reattached |
Paint Camera Gantry |
Clear top for terracing and corner at old pavilion |
Cement Facings of East Terracing |
Field Drain Bottom Right of Park |
Cut tree branches |
Fix wall behind bottom goal (add coping stones) |
New hooks in concrete behind goals |
Paint old pavilion and replace guttering |
Paint dugouts |
Rebrick wall of old pavilion |
Paint corners of slabs with yellow markings |
fix coping stone behind home goal |
Fix gate at top of terracing |
Fix boards |
Install four P.A. Horns |
Indoor Tasks
Kitchen |
---|
Grills removed from kitchen door |
Replace Glass |
Replace Glass in Back door |
Varnish/Paint fire exit door |
Replace Lighting |
Away Dressing Room |
Paint ceiling |
Clean/paint walls |
Replace light fittings in toilet |
paint ceiling in showers |
Clean shower heads |
clean tiles |
fix drain |
remove shower room door |
Main Corridor |
Paint doors ands surrounds (sand, undercoat, gloss) |
clean walls |
paint back door |
Referee’s Room |
Paint doors, ceilings, etc. |
Clean tiles |
Grout shower tray |
Home Dressing Room |
Paint ceiling and wash walls |
Physio room painted |
managers office, floor painted |
Paint ceiling in shower room and clean tiles |
replace bulb in toilet |
fix cistern |
Vents for refs room and boot room |
Outside Pavilion
Paint security bars |
Gas box |
Paint railings outside fire exit |
Render brickwork at main gate |
security light installed at side of building |
Paint back door |